ATTENTION architects, designers, builders, contractors, engineers and developers
CALL US TODAY · 07936 934507
The environmentally friendly, efficient new construction system that could reduce your build time by 75 per cent!
Imagine a property built of blocks made from a sustainable material (perlite) without chemicals or plastics, that has excellent sound and thermal insulation, outstanding resistance to moisture, and no need for mortar.
In fact, forthcoming legislation which will make ‘cold bridges’ – absorbent materials that allow moisture and cold to travel easily around buildings – illegal, will eventually make concrete-based products obsolete.
Our 3E and expanded clay brick building systems use a specially formulated, water-resistant foam mortar-alternative called Titan Cement from foundation level, eradicating such problems.
System 3E ‘elements’ are not only environmentally friendly but simply click into place by following a pre-supplied built template, without the need for mortar or time-served skills, meaning your build takes a quarter of the time to complete compared with traditional methods – saving you not just time but money too.
Sound too good to be true? Well, System 3E is a revolutionary eco-technology that is taking the construction world by storm! Originating in Poland, there are already many examples of its success across Europe and as far afield as the USA.
Now, thanks to 3Homee, this ground-breaking building system is readily available to designers, architects, builders, contractors, engineers and developers in the UK. And what’s more, by using these products, you’ll be helping the UK construction industry meet its decarbonisation targets thanks to the superb ‘green’ credentials of perlite.
1.
2.
3.
Eco-friendly building product kind to human health and the environment, with outstanding resistance to damp, mould, fungi and algae
Excellent natural thermal and sound insulation
Simple ‘click-click’ bonding system following a pre-supplied template: 75 per cent shorter build time with no need for mortar, a skilled workforce, or good weather conditions!
Got a question? We’re here to help.
Perlite is sustainable mineral, a kind of volcanic ash that is mined and processed with a negligible impact on the environment. It’s a high-performance solution for the construction industry, with a nearly unlimited supply throughout the world. System 3E comprises 22 ‘elements’ made from perlite that can be used in a versatile and creative way to construct any type of building – the only limit is your imagination!
It is a natural, sustainable material free from chemicals and plastics, that is friendly to both human health and the planet. A single-layer wall possesses excellent thermal and sound insulation , and has outstanding moisture resistance, so you will not encounter any issues with cold bridging, heat, noise, damp, mould, fungi or algae. System 3E buildings ‘breathe’ making them ideal for allergy sufferers. There’s no need to use mortar or any bonding agent – the elements click together without the requirement for a skilled workforce, and can be constructed in any weather conditions.
No, there is no need to use additional insulation or damp-proofing. It is possible to skim plaster directly onto the interior of the 3E elements without using plasterboard, although plasterboard can still be installed if you prefer. The exterior can be clad, painted, rendered, or ask for further options
Yes, it is comparable to other building materials in terms of structural strength – the compressive strength of System 3E elements is ≥ 1,5 N / mm2.
Yes, you can combine 3E elements with other types of building materials and structural designs. Just call us with your query and we’d be very happy to advise.
Yes of course! We can provide training modules on designing buildings using System 3E elements and in the ‘click click’ fastening method (which does not require specialist construction skills or experience). The training courses are quick and easy and take no more than two hours.
System 3E is much quicker due to it not needing any mortar, and its simple bonding method doesn’t require any specialist skills. This means you can reduce projected construction time from, for example, 12 months using traditional materials and methods, to as little as 3 months.
Most orders take four weeks to be fulfilled, but please contact us for an up-to-date estimate on delivery times. With 3Homee, you don’t need to worry about disrupted supply and we can guarantee prices and availability.